If you have shopped condos along Siesta Key, Longboat Key, or downtown Sarasota this year, you have probably noticed the pace feels different from a regular house hunt. That is not just a feeling.
In Sarasota County closings during the first week of November, single-family homes had a median of 30 cumulative days on market. Condos had a median of 116. The countywide median sale price that week was $415,000, and homes sold for an average of 96% of the last list price. Those figures describe that week's closed sales, not a guarantee for every listing (Team Renick / Stellar MLS, Nov. 1–7, 2026).
The broader trend points the same way. In the third quarter, the REALTOR Association of Sarasota and Manatee reported 3.7 months of supply for Sarasota County single-family homes and 3.9 in Manatee County, versus 4.9 and 5.0 months for condos and townhomes. Condo and townhome sales were actually up sharply — 26.8% in Sarasota County and 13.9% in Manatee — but those attached homes still take longer and leave buyers more room to negotiate (RASM Q3 2026).
A big reason condos move differently is paperwork. After the Champlain Towers collapse in Surfside in 2021, Florida required older and taller buildings to prove two things: that they have been inspected, and that the association is reserving money for major structural work. One of those requirements has a hard date at the end of this year.
Two different reports, one December 31 wall
A milestone inspection is a structural inspection of an aging condominium or cooperative building that is three or more habitable stories high. In general, it is first due when the building reaches 30 years of age, and every 10 years after that. A local government can require the first inspection at 25 years when it finds that local conditions warrant it. The building's age is based on the certificate of occupancy (Florida DBPR, Inspections).
A Structural Integrity Reserve Study, or SIRS, is different. It is a reserve study plus a visual inspection of specific structural and life-safety items — roof, structure, fire protection, plumbing, electrical, waterproofing and exterior painting, windows and exterior doors, and other structural items over a set dollar threshold. Associations with buildings three habitable stories or higher must complete one at least every 10 years. Buildings under three stories are generally outside the SIRS requirement (DBPR Inspections; DBPR FAQs).
For unit-owner-controlled associations that existed on or before July 1, 2022, the general deadline to complete that first SIRS was December 31, 2025. That date has already passed. The statute then gives a narrow second path: if the association must complete a milestone inspection on or before December 31, 2026, it may complete the SIRS at the same time. The state's own guidance is blunt: "under no circumstances may the SIRS be completed after December 31, 2026" (DBPR FAQs; DBPR Inspections).
December 31 is not a soft target. If you own a unit in a building that still needed to use that pairing path, or you are under contract on one, this is a this-month conversation with the association, not a New Year's resolution.
For an owner with an active listing, that means one practical step before the holidays: ask the association in writing where the SIRS stands, then disclose what you learn rather than waiting for a buyer's question. A unit that has the study in hand competes on its documents. A unit that is still waiting competes on price, and in a market where condos already sit nearly four times longer than houses, price is the expensive place to compete.
What the study changes about your fees
The SIRS is not just a report to file in a drawer. Once it is done, the association generally has to fund reserves according to that study. For budgets adopted on or after the end of 2024, associations subject to SIRS generally may not waive or reduce funding for the structural items in the study. After the association receives the SIRS, it must notify owners and report completion to the state Division of Condominiums within 45 days (DBPR Inspections; DBPR FAQs).
If the study shows the reserve account is short, the association may have to raise regular fees, levy a special assessment, or take out a loan. That is often what buyers mean when they say they are afraid of "the assessment." The number can be modest, or it can be large enough to change whether the unit is a good buy at the list price.
Sellers: price against condos and assemble the document packet first
Price your unit against other condos, not against the house down the street that went pending in 30 days. Then put the documents in order before the first showing: the SIRS, the milestone report if one is required, the budget, the reserve schedule, assessment history, and recent minutes. A buyer who cannot see those items will either walk or discount the offer. A complete packet will not sell an overpriced unit, but a missing packet can stop a well-priced one.
Buyers: read the building file before the view
Do not fall in love with the water view until you have the building's file. Florida law requires structural inspection reports and reserve studies to be official records, and they must be provided to potential purchasers. Ask for them in writing. If the association cannot produce a SIRS on a building that needed one, treat that as a problem, not a paperwork delay.
Then read the assessment history. A lower list price with a large coming assessment is not a bargain. A slightly higher list price in a building that has already funded the work can be the better net deal.
When you search, look at several buildings, not just one listing. Register when you view the second or third photo of a unit so we can help you compare the documents behind those photos, not just the kitchen.
Find Your Dream Home in Sarasota
Compare condos across the buildings you are considering, not just one listing at a time.
Find Your Dream Home in SarasotaThis article is general information for condo owners, buyers, and sellers in the Sarasota, Manatee, and Charlotte County area. It is not legal, engineering, or association advice, and it is not a finding about any specific building. Deadlines and exemptions depend on the building's height, age, occupancy, and control, and on the association's budget history. Confirm the status of any condominium with the association, a licensed attorney, and, where needed, a qualified engineer or reserve professional. Official guidance is at condos.myfloridalicense.com.
No comments yet. Be the first to share your thoughts!