VOCE
    S
    LoginStart Creating

    About

    • Our Community
    • Pricing

    Resources

    • Browse Articles
    • Login

    Legal

    • Terms of Service
    • Privacy Policy
    • Cookie Policy
    • Community Guidelines
    • Accessibility

    Support

    • Contact Us
    • San Ramon, CA

    © 2026 VOCE.COM. All rights reserved.

    1. Read
    2. Q&A
    3. For a 12-month construction window on a SIPs build, is that

    For a 12-month construction window on a SIPs build, is that usually enough time, or do high-performance builds tend to run longer than a standard frame job?

    Answered
    CPAsked by Craig Pollack·Aug 26, 2026·0

    1 answer

    • AMAaron Meilich · Sales Manager - Construction & Specialty Portfolio Lending NMLS #769327·Aug 26, 2026·0
      Best answer

      HI Craig- They do tend to run longer depending on a variety of factors. If your question is geared towards the duration of a construction loan, that can be extended to 18 months without having to requalify. If additional time is needed the construction loan can be requalified(refinanced) for an additional 12 months if needed. The initial goal would be to ensure the supplier has reasonable lead times and availability of the trades before the construction loan is activated. Hope that helps!